INDEPENDENT RESEARCH · LAW / ENERGY / INFRASTRUCTUREUS × CHINA / FIELDNOTES No. 01
SHARED TOPICS / RESEARCH ATLAS
Cost & risk
One question, across law, projects, contracts and research.
Latest Updates · 18 November 2026
- UPDATEDPJM large-load registry: 9 November compliance filing
- NEWTeraWulf–Kentucky Power amended Muskie electric service agreement
- NEWGoogle credit support for TeraWulf's Anthropic-backed data-centre financing
- NEWTeraWulf–Fluor definitive EPC framework for three Justified data-centre buildings
- NEWGoogle–Voltus PJM gigawatt-scale bring-your-own-capacity agreement
- NEWAEP–X-energy development agreement and Amazon funding for proposed Indiana SMRs
- NEWMuskie Data Campus, Kentucky — 1 GW contracted power under review
- NEWJustified Data Campus, Kentucky — Anthropic leases with Google credit support
- NEWGoverning the Unmeasured Load: Hyperscale Data Centres, Systemic Risk and the Assessment–Management Gap in EU Law
- NEW2026 Large Load Literature Review and Data Sources — November update
- NEWData Centers and Large Loads — RMI November regulator toolkit
- NEWScaling Markets for Power Flexibility — replicable DER deal structures
LAW
PJM co-location order
Order directing computational-load reliability standards
Large Loads Action Plan
NERC announcement of the CEO letter on large-load actions
10 U.S.C. § 2921
FERC Order No. 1920 — long-term regional transmission planning and cost allocation
DOE emergency order on PJM backup resources
Federal Power Act jurisdiction, rates, adequacy, emergency authority and review
Southwest Power Pool, Inc., Order Accepting Tariff Revisions Subject to Condition
Southwest Power Pool, Inc., Order Accepting CHILLS Tariff Revisions Subject to Condition
PJM Interconnection, L.L.C., Order Rejecting Amended Interconnection Service Agreement
Level 3 Computational Load Alert
Georgia Public Service Commission Compliance Order Approving Tariff Revision and Large-Load Contract Framework
AEP Ohio data-center application and tariff implementation guidance
Operative AEP Ohio Data Center Tariff
Texas S.B. 6 large-load statute
ERCOT Batch Zero process
Data Centers in Virginia
Virginia SCC Final Order adopting large-load Rate Schedule GS-5
Rider T1 Final Order
Microsoft notice of appeal from July 31 Rider T1 final order
Basic Rules for Electricity Market Operation
Interim Measures for Power Reliability Management
Notice on Orderly Development of Single-User Green-Power Direct Connection
Action Plan for High-Quality Development of Computing Infrastructure
Notice Improving Pricing Mechanisms to Promote Nearby Consumption of New-Energy Generation
State Council General Office Notice on Standardizing Urban Utility Charges
Notice issuing Measures to Promote Green, High-Quality Development of Data Centers in the Beijing Economic-Technological Development Area
Nanjing Operating Measures for Government-Enterprise Shared Electricity Connection Works
Notice issuing Yunnan's Implementation Plan for Promoting Green-Power Direct-Connection Construction
Zhengzhou Implementing Rules for Electricity Connection Works (Trial)
PROJECT
AWS / Talen Susquehanna Data Campus
Switch Citadel Campus (Tahoe Reno)
Meta Richland Parish / Hyperion
Google The Dalles Data Center
xAI Colossus
GDS Kunshan Guojin Data Center REIT
CONTRACT
TeraWulf–Kentucky Power 500 MW ESA and 1 GW LOA
AEP Ohio large-load service architecture
Dominion large-load tariff architecture
Georgia PSC data-center contract review and minimum-bill framework
DTE Electric-Green Chile Ventures 1,383 MW primary supply package (Oracle-guaranteed)
Evergy 2026 data-center ESA portfolio
Xcel/NSP >100 MW large-load tariff
VNET 100 MW customer cooperation framework
VNET–CGN Solar 2023 green-power purchase agreement with five-year supply-guarantee clause
ACADEMIC
Extracting Profits from the Public: How Utility Ratepayers Are Paying for Big Tech's Power
Policy and Cost Allocation Considerations for Large Electric Load Interconnections: Emerging Policy Trends in Rate Structures, Interconnection, and Cost Impacts on Other System Users
Electricity Rate Designs for Large Loads: Evolving Practices and Opportunities 2026 Update
Revisiting the Relationship Between Demand Growth and Electricity Prices
Have Data Centers Raised Your Electric Bill? Causal Evidence from the United States
Cutting the Electric Bill for Internet-Scale Systems
Speed to Power: Solutions for Accelerating Large Load Connections
The Role of the U.S. Electric Distribution System in Serving Data Center and Other Large Loads
Governing the Energy Bottleneck
Grid Reliability Through Clean Energy
Climate Resilience and Private Law's Duty to Adapt
Financing the AI Buildout
Government Provision of Artificial Intelligence Factors: Jurisprudential Foundations and Institutional Responses
Optimization Strategy for Spatiotemporal Cooperative Operation of Multiple Data Centers Considering Load-Response Characteristics
Prediction of Overall Energy Consumption of Data Centers in Different Locations
Regulatory Dilemmas in the Development of China's Artificial Intelligence Computing-Power Industry and Paths for Resolution
Bidirectional Collaborative Optimization Scheduling of Adjustable Resources in Computing and Power Nodes
Source index
- Google–Constellation 20-year nuclear uprate PPA (890 MW new capacity)
- AEP–Google Cheyenne Fuel Cell 20-year PPA (702 MW planned)
- Amazon–Constellation Calvert Cliffs 20-year nuclear PPA (690 MW total; 190 MW uprate)
- Utility Service Obligations in the Large Load Era
- Powering Artificial Intelligence: Strategies for Integrating Data Centres into Electricity Systems
- CAISO large-load tariff amendment (FERC ER27-532)
- Kentucky Power seeks PSC approvals for the TeraWulf Muskie supply package
- Jilin pilot implementation plan for multi-user green-power direct connections