INDEPENDENT RESEARCH · LAW / ENERGY / INFRASTRUCTUREUS × CHINA / FIELDNOTES No. 01
SHARED TOPICS / RESEARCH ATLAS
Grid access
One question, across law, projects, contracts and research.
Latest Updates · 18 November 2026
- UPDATEDPJM large-load registry: 9 November compliance filing
- NEWTeraWulf–Kentucky Power amended Muskie electric service agreement
- NEWGoogle–Voltus PJM gigawatt-scale bring-your-own-capacity agreement
- NEWMuskie Data Campus, Kentucky — 1 GW contracted power under review
- NEWJustified Data Campus, Kentucky — Anthropic leases with Google credit support
- NEW2026 Large Load Literature Review and Data Sources — November update
- NEWScalable Reference Electrical Architectures for Modern Data Centers
LAW
PJM co-location order
PJM large-load show-cause order
SPP large-load show-cause order
NYISO large-load show-cause order
MISO large-load show-cause order
CAISO large-load show-cause order
ISO-NE large-load show-cause order
2026 draft National Transmission Needs Study
Federal Power Act jurisdiction, rates, adequacy, emergency authority and review
DOE section 403 direction and attached proposed large-load ANOPR
PJM Interconnection, L.L.C., Order Rejecting Amended Interconnection Service Agreement
PJM Interconnection, L.L.C., Order Addressing Arguments Raised on Rehearing and Compliance
Notice of PJM partial co-location compliance filing
AEP Ohio data-center application and tariff implementation guidance
Texas S.B. 6 large-load statute
ERCOT Large Load Forecasting Criteria
Governor of Texas data-center audit directive
Batch Zero Conditional Classification issued to Transmission and/or Distribution Service Providers
Virginia SCC Final Order adopting large-load Rate Schedule GS-5
Notice on Orderly Development of Single-User Green-Power Direct Connection
Notice on Orderly Development of Multi-User Green-Power Direct Connection
Notice on GEC issuance for non-public-grid renewable projects
Implementation Opinions on East Data–West Compute and the National Integrated Computing Network
Electricity Law of the People's Republic of China
Regulation on Electricity Supply and Use
Rules on Electricity Supply Business
State Council General Office Notice on Standardizing Urban Utility Charges
Nanjing Operating Measures for Government-Enterprise Shared Electricity Connection Works
Xinjiang's first multi-user green-power direct-connection projects announced
Notice issuing Yunnan's Implementation Plan for Promoting Green-Power Direct-Connection Construction
Zhengzhou Implementing Rules for Electricity Connection Works (Trial)
PROJECT
AWS / Talen Susquehanna Data Campus
Zhongjin Wulanchabu Zero-Carbon Compute Base
CONTRACT
Alliance Cloud Services–neocloud 20 MW MSA
TeraWulf–Kentucky Power 500 MW ESA and 1 GW LOA
Talen–AWS nuclear PPA and BTM-to-front-of-meter restructuring
NDRC/NEA 2025 single-user green direct-connection architecture
NDRC/NEA 2026 multi-user green direct-connection architecture
ACADEMIC
Allocating Electricity
Extracting Profits from the Public: How Utility Ratepayers Are Paying for Big Tech's Power
Policy and Cost Allocation Considerations for Large Electric Load Interconnections: Emerging Policy Trends in Rate Structures, Interconnection, and Cost Impacts on Other System Users
Speed to Power: Solutions for Accelerating Large Load Connections
Governing the Energy Bottleneck
The Role of Flexible Connection in Accelerating Load Interconnection in Distribution Networks
To Defer or To Shift? The Role of AI Data Center Flexibility on Grid Interconnection
Climate Resilience and Private Law's Duty to Adapt
Optimization of Computing-Power and Electricity Synergy Considering Diverse Green-Electricity Consumption Modes and Spatiotemporal Flexibility
A net-grid-benefit test for interconnecting AI data centres
Source index
- Cheyenne Fuel Cell / AEP–Google dedicated 702 MW supply project
- Datang Zhongwei Cloud Base 500 MW photovoltaic green direct-supply project
- Utility Service Obligations in the Large Load Era
- Unlocking AI Data Center Interconnection Capacity Through Coordinated Grid and Data Center Flexibility
- Powering Artificial Intelligence: Strategies for Integrating Data Centres into Electricity Systems
- CAISO large-load tariff amendment (FERC ER27-532)
- Kentucky Power seeks PSC approvals for the TeraWulf Muskie supply package
- Jilin pilot implementation plan for multi-user green-power direct connections